How much does an ADU cost? A complete budget guide

If you’re planning an ADU, expect a total of roughly $80,000 to $400,000, depending on what you build and where. This guide walks you through every cost that goes into that total, using real contractor quotes, so you can tell what a quote covers and what you’ll still need to budget for.

Small wood-clad backyard ADU with a deck and glass doors, set in a fenced garden

Key takeaways

  • A complete ADU budget is made of seven cost categories: planning and design, building permits and impact fees, site preparation, utility connections and upgrades, construction and finishes, completion expenses, and contingency.

  • The “ADU construction” quote and the total cost of developing an ADU are two very different numbers, and not recognizing the difference between them is one reason ADU estimates seem to vary so widely.

  • Cost per square foot can be misleading because design, permits, and site work don’t shrink proportionally with size. In other words, a smaller ADU can sometimes cost more per square foot than a larger one.

  • Before trusting any estimate, confirm what’s included, what’s excluded, what’s an allowance, what conditions are unverified, and what could still change the price later on.

  • As an example, a real $156,000 building proposal in East Bay, California can become $10,000 to $20,000 more expensive once estimated finish materials are added, and before permits, utility upgrades, and contingency are even priced.

What's included in a complete ADU budget?

You don’t need to be a construction estimator to plan an ADU budget. You do need to make sure every major cost has a line in it. Your quote may combine some of the seven categories below, but each one should be included, priced separately, or clearly marked as unknown.

Planning and design

Feasibility studies, architectural design, engineering, and permit drawings. The East Bay proposal below included these costs, but other quotes may price them separately.

Permits and agency impact fees

Fees charged by your city, county, or other local agencies. In the examples below, the East Bay and Vista proposals excluded them, while the Liberty Hill proposal included standard permit fees.

Site preparation

Work needed to prepare the property, like site surveys, clearing, grading, excavation, tree removal, or improving construction access.

Utility connections and upgrades

Water, sewer or septic, electricity, and sometimes gas. Ask separately whether the quote includes basic connections and any upgrades your property may require.

Construction and finishes

The foundation or existing-structure work, framing, roofing, insulation, drywall, plumbing, electrical, installation labor, materials, fixtures, and appliances needed to build the ADU. Some quotes bundle labor and materials together. Others, like the East Bay proposal below, put construction labor in the package while leaving finish purchases to the homeowner. Follow your quote’s structure to have as much clarity as possible on what construction costs are not included.

Completion expenses

Costs that can show up near the end, like cleanup, final inspections, walkways, landscaping, or other closeout work (where applicable). A project can be construction-complete while some billable closeout tasks are still unfinished.

Contingency

Money reserved for conditions or costs that can’t be confirmed before construction begins.

How much does an ADU cost?

Published ADU cost estimates range from under $80,000 to over $400,000, mostly because they cover different ADU types, locations, and parts of the total budget. The four real contractor quotes in this guide fall within that range, from $149,500 for a 450-square-foot detached ADU in Liberty Hill, Texas, to $359,700 for a roughly 950-square-foot new ADU in Lakewood, Colorado.

None of those quotes is a full budget, and your final cost can differ from a quote in several ways. Some costs are left out, some are allowances that change with your selections, and some depend on property conditions that haven’t been checked yet. This guide shows what each price includes, what’s missing, and how to build a realistic budget for an ADU on your property.

All four quotes are contractor proposals from September 2026, documented through Wonderly. See how we chose them.

Below are four real ADU quotes. Each one covers a different part of the total budget. Design, for example, is included in three of them and unknown in the fourth. So before you compare prices, check what each one includes. The grid shows all four side by side. Each example is then broken down into the same seven categories, starting with the two detached ADUs, which are the easiest to compare. For more San Diego County examples and local fees, see our San Diego ADU cost guide.

ADU cost benchmarks: what each price includes

  • Included
  • Partly included
  • Not included
  • Not stated
Vista, CA$238,700Liberty Hill, TX$149,500 / $169,500Lakewood, CO$359,700East Bay, CA$156,000
Planning and designNot stated: Earlier design costs unknownIncludedIncludedIncluded
Permits and agency impact feesNot included: Paid separatelyPartly included: Standard permit fees onlyPartly included: Application work onlyNot included
Site preparationPartly included: Some site improvements excludedNot statedPartly included: Difficult ground excludedNot stated
Utility connections and upgradesPartly included: Tie-ins onlyPartly included: Taps and upgrades excludedPartly included: Upgrades excludedPartly included: Rough only
Construction and finishesPartly included: Appliances excludedIncluded: Within allowancesPartly included: Fixtures and appliances excludedPartly included: Finish materials excluded
Completion expensesNot statedNot statedNot statedNot stated
ContingencyNot statedNot statedNot statedNot stated
  • Vista, CA$238,700
    • Planning and designNot statedEarlier design costs unknown
    • Permits and agency impact feesNot includedPaid separately
    • Site preparationPartly includedSome site improvements excluded
    • Utility connections and upgradesPartly includedTie-ins only
    • Construction and finishesPartly includedAppliances excluded
    • Completion expensesNot stated
    • ContingencyNot stated
  • Liberty Hill, TX$149,500 / $169,500
    • Planning and designIncluded
    • Permits and agency impact feesPartly includedStandard permit fees only
    • Site preparationNot stated
    • Utility connections and upgradesPartly includedTaps and upgrades excluded
    • Construction and finishesIncludedWithin allowances
    • Completion expensesNot stated
    • ContingencyNot stated
  • Lakewood, CO$359,700
    • Planning and designIncluded
    • Permits and agency impact feesPartly includedApplication work only
    • Site preparationPartly includedDifficult ground excluded
    • Utility connections and upgradesPartly includedUpgrades excluded
    • Construction and finishesPartly includedFixtures and appliances excluded
    • Completion expensesNot stated
    • ContingencyNot stated
  • East Bay, CA$156,000
    • Planning and designIncluded
    • Permits and agency impact feesNot included
    • Site preparationNot stated
    • Utility connections and upgradesPartly includedRough only
    • Construction and finishesPartly includedFinish materials excluded
    • Completion expensesNot stated
    • ContingencyNot stated
Do these bids use consistent categories? Heck no. This is the real world of ADU development. So we sorted every line of each bid into the same seven categories, in the same order, so you can see what each price covers and what it leaves out.

Vista detached ADU: $238,700, design costs unknown

Contractor proposal, September 2026. Detached, 749 sq ft.

  1. Quoted priceCovers construction and finishes at a standard level, ordinary site and foundation work, and utility tie-ins, through final inspection$238,700
  2. Planning and designEarlier design costs aren’t shown in this proposalUnknown
  3. Permits and agency impact feesGovernment fees are paid separately by the homeownerNot included
  4. Site preparationOrdinary site work is included; certain site improvements are notPartly included
  5. Utility connections and upgradesTie-ins onlyPartly included
  6. Construction and finishesAppliances and solar are not included; the homeowner supplies and installs appliancesPartly included
  7. Completion expensesNot stated
  8. ContingencyNot stated

Liberty Hill detached ADU: $149,500, design and standard permit fees included

Contractor proposal, September 2026. Detached, 450 sq ft ($169,500 at 550 sq ft).

  1. Quoted priceCovers planning and design, standard permit fees, and construction and finishes within the stated allowances, including kitchen, bathroom, laundry, gym, and covered patio$149,500
  2. Permits and agency impact feesStandard permit fees are included; impact fees beyond the allowance are notPartly included
  3. Site preparationNot stated
  4. Utility connections and upgradesNew utility taps, capacity upgrades, and extraordinary utility or municipal requirements are not includedPartly included
  5. Construction and finishesAnything above the allowances is not includedWithin allowances
  6. Completion expensesNot stated
  7. ContingencyNot stated

Lakewood new ADU: $359,700, design included

Contractor proposal, September 2026. New ADU, about 950 sq ft.

  1. Quoted priceCovers planning and design (architectural and structural plans), permit application work, and construction from foundation through finishes and utility connections$359,700
  2. Permits and agency impact feesApplication work is included; permit and agency fees are notPartly included
  3. Site preparationDifficult ground or hidden site conditions are not includedPartly included
  4. Utility connections and upgradesUtility upgrades are not includedPartly included
  5. Construction and finishesFixture and appliance purchases are not included, and finish selections still to be decided are not pricedPartly included
  6. Completion expensesNot stated
  7. ContingencyNot stated

East Bay garage conversion: $156,000, design included

Contractor proposal, September 2026. Garage conversion to 1BR ADU, about 400 sq ft.

  1. Quoted priceCovers planning and design (design, permit drawings, and engineering), rough utility connections, and construction labor$156,000
  2. Construction and finishesOwner-selected finish materials, paid separately; planning estimate$10,000 to $20,000
  3. Package plus estimated finish purchases$166,000 to $176,000
  4. Permits and agency impact fees$1,000 to $20,000 is typical for an ADU building permit in the East BayNot included
  5. Site preparationNot stated
  6. Utility connections and upgradesRough connections only; any upgrades are not determined and often a major cost. $10,000 to $50,000 is typicalPartly included
  7. Completion expenses$5,000 to $50,000 is typicalNot stated
  8. Contingency5% to 10% is the standard buffer, about $7,500 to $15,000 for this projectNot stated
  9. Estimated complete project costAbout $190,000 to $310,000

These four examples involve different ADU types, sizes, locations, and scopes of work, so their prices aren’t directly comparable. That’s why it’s important to understand exactly what’s included in each quote: the initial price may not reflect the full cost of building your ADU.

Note: if you’re considering a prefab ADU, it’s worth knowing that a prefab kit price usually covers only the shell or building components delivered to your property. It might not include the foundation, site preparation, permits, installation, utility connections, or finishes. Before comparing it with another estimate, find out what still needs to be added.

How we chose these examples

All four examples are real contractor proposals from September 2026, documented through Wonderly. We removed names and addresses.

For each example, we list what the price includes and excludes as the proposal or builder states it. We only add amounts that are written down, such as the East Bay finish estimate. When a proposal leaves a cost unpriced, we keep it out of the quoted subtotal and use a typical range to estimate the complete cost. Prices are shown as quoted, without adjusting for inflation or location.

Build your complete ADU budget

While you evaluate quotes, the following worksheet can be helpful to track what each cost covers and what still needs to be confirmed. If your contractor’s price includes both labor and finish materials, enter the full amount under construction and leave the separate finish-material row blank. If you’ll buy finishes separately, as in the East Bay example, enter them on their own row. The goal is simple: every cost gets counted once.

Enter your quote to start.

  1. Planning and design
  2. Permits and fees
    Who confirms it
    Your city or county
    Next check
    Confirm current fee schedule
  3. Sitework
    Who confirms it
    Your contractor
    Next check
    Confirm after a site visit
  4. Utility connections
    Who confirms it
    Contractor and utility provider
    Next check
    Confirm capacity and connection scope
  5. Construction labor and included materials
    Who confirms it
    Your contractor
    Next check
    Confirm the written scope
  6. Separately purchased finish materials
    Who confirms it
    You and your contractor
    Next check
    Price actual selections, tax, and freight
  7. Completion expenses
    Who confirms it
    Contractor and responsible jurisdiction
    Next check
    Confirm cleanup, final inspections, and any walkway or landscaping work
  8. Contingency

Your entries stay in this browser. Nothing is sent to Wonderly.

Here’s how the East Bay proposal fits into the worksheet:

The $10,000 to $20,000 finish figure below belongs on its own row because the homeowner would pay it outside the $156,000 quoted package. It’s a planning estimate, not an allowance already included in the contractor’s quote.

How the East Bay proposal fits into the budget worksheet
ExpenseAmountStatusWho confirms itNext check
Design and ordinary construction scope$156,000Included in the proposed packageContractorConfirm final plans and written scope
Owner-selected finish materials$10,000 to $20,000Paid separately; planning estimateHomeowner, suppliers, contractorPrice selected quantities, tax, and freight
Permits and agency feesNot pricedPaid separatelyResponsible jurisdictionObtain the applicable current fee schedule
Additional utility work beyond included rough connectionsNot determined (often a major cost)Typically required, depending on existing capacityContractor and utility providerVerify capacity and confirm whether additional work is needed
Completion expensesNot specifiedUnresolved or not applicableContractor and responsible jurisdictionConfirm cleanup, final inspections, and any walkway or landscaping work
ContingencyNot specifiedUnresolvedA qualified estimator or reviewerSet a reserve based on remaining uncertainty

Scroll sideways if needed to see every column.

Use this worksheet to find missing costs, not to add every category on top of your quote. If your contractor’s price already includes something, like design or utility work, don’t count it again. And if a cost is marked “not priced” or “unresolved,” treat it as still to be determined, not $0. You won’t really be able to project your complete project budget until those missing amounts are estimated.

How does ADU type affect the cost?

The type of ADU you choose changes how much must be built from scratch and which parts of your existing property can be reused.

Detached ADU

A separate building with its own foundation, exterior walls, roof, and utility connections. It offers the most design flexibility but often requires more sitework and new construction.

Conversion ADU

An existing garage, basement, or other space converted into a legal home. Reusing the structure can save money, but an existing structure isn’t automatically ready to live in. Electrical, plumbing, insulation, ceiling height, windows, and fire-safety requirements may still require substantial upgrades.

Attached (or a bump-out) ADU

A new addition that is physically connected to your home. Connecting new construction to an older home can create structural and utility complications.

ADU options: what changes the budget

OptionPotential savingsExpenses that remainWhat can erase the savings
DetachedNone inherently; highest baseline flexibilityAll categories, from the ground up, permitsDifficult site conditions, custom design
AttachedSome shared systems and exterior workTie-in to existing structure, permitsComplications connecting to older home systems
ConversionExisting structure and shell already builtElectrical, plumbing, insulation, egress, ceiling height, permitsExisting structure needing more rework than expected

Scroll sideways if needed to see every column.

Why can similar-sized ADUs have very different prices?

Two ADUs with the same square footage can have very different costs, because square footage only tells part of the story. Square footage estimates do not account for site work, utility work, or design choices, among other things such as permit costs or site surveys.

Location

Labor rates, material prices, permit fees, and local requirements vary by city and region.

How the project is managed

Hiring a general contractor saves you time and puts day-to-day coordination in their hands, while managing parts yourself may reduce costs but requires more time and makes you responsible for hiring trades, scheduling work, and resolving problems that can cause delays or added costs.

Site access and ground conditions

For example: a flat, accessible yard is generally easier to build on than a steep lot or a backyard that excavation equipment cannot easily reach.

Utility distance and capacity

Costs increase when water or sewer connections are challenging, or when the property needs utility upgrades such as an electrical service upgrade.

The condition of an existing structure

Attached ADUs and conversions will likely require repairs or upgrades to existing framing, foundations, reworking of HVAC systems and customized routing of existing plumbing and electrical systems.

Design and finish choices

Simple layouts and builder grade materials generally cost less than complex designs, custom features, and premium or modern finishes. Just as you can get basic or premium trim packages on vehicles, so too you can get basic or premium finishes on homes, though homes offer far more choices than any vehicle. That number of decisions can be overwhelming for first-time developers.

Construction costs are tied to labor costs, which vary widely from one part of the country to another, and are based largely on land costs (just as land costs are far more expensive in San Francisco, so too building development in San Francisco is far more expensive than development in Cleveland). ADU structural types also vary widely in cost, with detached new construction ADUs being both the most common type of ADU, but also the most expensive. Even within the category of detached ADUs in a particular market like Bend, Oregon, the pricing will vary tremendously (from $125,000 for a prefabricated manufactured-style ADU to $400,000 for a bespoke custom designed contemporary ADU).

Don’t compare ADUs by cost per square foot alone. Square footage is useful, but it can’t predict the total cost on its own. Some expenses, including design and site setup, don’t shrink much when an ADU gets smaller. For example, a Portland-area analysis of projects built from 2016 through 2019 found that several of these costs remained similar across projects of different sizes. That’s why a smaller ADU can have a higher cost per square foot even when its total cost is lower.

Use cost per square foot only when the projects have similar locations, ADU types, site conditions, finish levels, and included work.

How a $156,000 quote grows by $10,000 to $20,000

A 2026 contractor proposal priced a roughly 400-square-foot, one-bedroom garage conversion at $156,000. The package included design, engineering, permit drawings, construction, and rough utility work.

What’s still unknown? Notably, the proposal doesn’t price permit and development fees (the administrative charges your city, county, or other local agencies collect to review and approve the project). Nor does it specify a contingency amount (money set aside for costs that can’t be confirmed in advance, like hidden damage discovered once work begins). It also doesn’t establish whether the property will need utility work beyond the rough connections included in the package, like utility upgrades to the property’s main electrical and water service. “Rough” utility work means running the basic water, sewer, or electrical lines to the structure, before finishing details like fixtures and outlets are added.

So while $156,000 is a useful quote, depending on your situation, the remaining costs could add another $10,000 to $150,000. And as mentioned previously, owner-purchased finish materials alone add an estimated $10,000 to $20,000 to this quote.

The table below shows what the $156,000 price includes, which costs still need to be added, and which amounts are still unknown.

From proposal price to project budget

ItemAmountIncluded in the $156,000 package?Evidence or status
Design, permit drawings, and engineeringIncludedYesContractor proposal
Rough utilities, framing, and installation laborIncludedYesContractor proposal
Owner-purchased finish materials$10,000 to $20,000 estimateNoExplicitly excluded from the contractor proposal
Permit and agency feesNot priced ($1,000 to $20,000 is typical)NoExplicitly excluded from the contractor proposal
Additional utility work beyond included rough connectionsNot determined ($10,000 to $50,000 is typical)Only if requiredExisting capacity still needs to be confirmed
Completion expensesNot specified ($5,000 to $50,000 is typical)Not addressedConfirm whether any closeout work needs a separate budget
ContingencyNot specified (5% to 10% is the standard buffer, about $7,500 to $15,000)Not addressedNo contingency amount appears in the proposal
Package plus estimated finish purchases$166,000 to $176,000Subtotal only, not the complete project cost
Estimated complete project costAbout $190,000 to $310,000Subtotal plus the typical ranges above; a planning range, not a quote

Scroll sideways if needed to see every column.

The key word is subtotal. The contractor package and finish estimate are the only amounts written down for this project. Adding typical ranges for permit fees, utility work, completion work, and contingency gives an estimated complete project cost of about $190,000 to $310,000. Treat that as a planning range, not a price: each of those costs still has to be confirmed for this property.

How much contingency should you include?

A contingency is money reserved for costs you can’t confirm before construction begins, like hidden damage inside a wall or unexpected soil conditions. These conditions often aren’t visible until work begins. A contingency shouldn’t cover costs you already know about or choices you haven’t finalized.

Keep these three types of costs separate:

Contingency

Money reserved for conditions that can't yet be verified.

Allowance

An amount already included in a quote for an item whose final selection or cost remains undecided. If the quote contains a $5,000 flooring allowance, for example, that $5,000 is already inside the quoted total. The East Bay proposal works differently: its $10,000 to $20,000 finish estimate sits outside the $156,000 package and will be paid separately by the homeowner. It’s a planning estimate, not an allowance.

Homeowner-chosen change

An upgrade or addition you decide to make after the scope is set. Maybe you already know that you wish to have a particular gas or induction range that is $600 more expensive than the $1,200 budget allocated by the contractor. Budget for that $600 as a separate change, not as part of contingency.

How much should you reserve? With conversions and attached ADUs, it’s prudent to reserve 10% in your budget for construction contingency. For standalone detached new construction, a 5% construction contingency is adequate. The right amount depends on how much remains unknown. As more facts are nailed down about scope of work, you can revisit the reserve with your contractor or estimator instead of guessing on your own.

Construction contingency

  • Conversions and attached ADUs10%
  • Standalone detached new construction5%

How can you reduce ADU costs?

Many of the most useful cost decisions happen before construction begins, while they’re still easy to change. Focus first on choices that reduce the amount or complexity of the work.

Choose the placement carefully

Building near existing utility connections and in an area that equipment can reach may reduce sitework and utility costs. A steep or difficult-to-access location can increase them.

Keep the layout and roofline simple

A straightforward structural shell, that is essentially a rectilinear box, is generally easier and less expensive to build than curved building facades, or custom structural details of massive windows that span a whole facade.

Use a standard plan when it fits

A proven plan may reduce design work, but only if it works for your property and needs without major changes.

Select finishes early

Choosing windows, HVAC systems, cabinets, countertops, flooring, light fixtures, and appliances before construction helps replace allowances with real prices and reduces costly changes later.

Limit changes after the scope is set

A change made during planning is usually easier to price and schedule than the same change made during construction. Late changes often bring additional costs with them.

Compare quotes on the same scope

Ask builders to price the same plans, finishes, and sitework. Check allowances and exclusions before comparing totals, so a lower quote doesn’t turn into a higher bill when missing work is added.

Doing some work yourself may reduce what you pay for labor, but it also makes you responsible for coordination, scheduling, and quality. Weigh that tradeoff before counting on the savings.

Before choosing a DIY approach, confirm which work you can legally and safely perform, how it affects the permit process, and whether it could delay the contractor. Many contractors will not allow their work scope to weave with a homeowner for this reason. But, those same contractors may be happy to conclude their scope of work after drywall. But, bear in mind this means any subsequent work is your responsibility and the contractor can not be held accountable for any building failures that arise with any of the finished work.

What expenses continue after the ADU is built?

Your construction budget covers the cost of building the ADU. It doesn't cover every cost of owning or financing it afterward.

Plan separately for:

  • Maintenance and utilities. Ongoing repairs, upkeep, electricity, water, sewer, gas, internet, and other services.
  • Insurance. Your coverage or premium may change after adding another dwelling to the property.
  • Property taxes. An ADU may affect your property tax assessment, depending on local rules.
  • Financing. If you borrow to build the ADU, include loan payments and financing costs in your household budget.

If you plan to rent the ADU, keep expected rental income separate from the construction budget. First calculate what the project costs to build. Then evaluate income, operating expenses, vacancies, and financing separately to understand whether the investment works for you.

How to get a more useful estimate for your property

Published prices can help you understand the market, but they can’t tell you exactly what your ADU will cost. Each step below replaces more of the guesswork with facts.

  1. Published benchmark

    Shows what another project cost. It doesn't account for your property, location, or choices.

  2. Preliminary property estimate

    Uses your location, ADU type, and approximate size to narrow the range, but still relies on assumptions.

  3. Site and utility review

    Identifies conditions such as access, slope, utility distance, and electrical capacity that could change the price.

  4. Defined plans and selections

    Replaces rough assumptions with a specific layout, construction scope, and more accurate finish prices or allowances.

  5. Detailed proposal

    Shows what a contractor will provide and charge based on the current plans. Even at this stage, you still need to identify exclusions, allowances, unresolved conditions, and contingency.

  6. Confirmed scope and budget

    Before moving ahead, confirm the included work, allowances, exclusions, and payment schedule in writing. Keep a contingency for unresolved conditions and agree on how changes will be handled.

Start with a preliminary estimate for your property

The Wonderly ADU Planner turns your address and goals into ADU options, estimated costs, and the local rules for your property.

ADU Planner

Before requesting an estimate, gather:

  • Your property address and permitting jurisdiction
  • The intended use of the ADU
  • The approximate size and type
  • Basic information about the property and existing structures
  • Known issues such as a slope, limited access, or an older electrical panel
  • Your expected finish level
  • The completed budget worksheet from this guide

Ask these five questions about every estimate:

  1. What is included in this price?
  2. What is excluded and must be paid separately?
  3. Which amounts are allowances rather than fixed prices?
  4. Which property conditions haven't been verified yet?
  5. What decisions or discoveries could change the price?

The bottom line

The first ADU price you see is rarely the complete budget. Before relying on a quote, confirm what it includes, add each excluded cost once, and keep unpriced items open until they've been estimated. Then set aside a contingency for genuine unknowns.

You don't need a perfect number at the beginning. A reliable budget is a complete list of costs that gets more accurate as you learn more about your property, plans, and contractor's scope.

Why trust this guide

Wonderly helps homeowners plan ADUs with trusted local builders; this guide draws on real projects, official sources, and expert review.

Data you can check

Every cost, rule, and timeline links to its source, whether official city code, published pricing, or real builder proposals. Every page explains how we calculate every estimate and range.

Reviewed by experts

A named ADU builder, architect, or expert reviews each guide. We show their credentials, the date reviewed, and what still needs local verification.

Plan your own ADU

Our ADU planner uses this same data and method to turn your exact address and personalized goals into options, costs, and local rules for your specific property.

Frequently asked questions

Does an ADU construction quote include permits and utilities?

Sometimes, but there's no standard. A quote may include basic utility work while excluding permit fees or upgrades to your electrical, water, or sewer systems. Ask the contractor to list each of those items as included, excluded, or not yet priced.

Can I build an ADU for $100,000?

It may be possible in some locations or for a limited scope, but you shouldn't rely on that number without a property-specific estimate. The East Bay garage conversion in this guide was quoted at $156,000 before finish materials, permit fees, utility upgrades, and contingency. A $100,000 budget would likely require a smaller scope, lower local costs, favorable property conditions, or some combination of those factors.

What is usually the least expensive type of ADU?

A garage or existing-space conversion may cost less because part of the structure already exists. The condition of that structure matters, however. Repairs and upgrades to the foundation, framing, electrical system, plumbing, insulation, windows, or ceiling height can reduce or eliminate the expected savings.

Why can a small ADU have a high cost per square foot?

Some costs, including design, permits, and site setup, don't decrease in proportion to the size of the ADU. When those fixed costs are divided across fewer square feet, the cost per square foot increases even if the smaller ADU has a lower total price.

How accurate is an online ADU cost estimate?

Use it as an early planning range, not a final budget. An online estimate may account for your location, ADU type, and size, but it usually can't confirm site access, utility capacity, existing structural conditions, permit fees, or finish choices. A site review and detailed proposal are needed to replace those assumptions with confirmed costs. For an early range based on your address and goals, try the Wonderly ADU Planner.