Yes, with caveats. This guide covers properties permitted by the City of San Diego. If your residential lot has an existing or planned home, City rules and California law generally allow at least one ADU, and often more. What you can build depends on the type of ADU and your property's conditions.

The City's ADU bulletin, IB400 (opens in new tab), explains the process, and SDMC §141.0302 (opens in new tab) holds the local rules. State law protects some ADUs and overrides conflicting local limits (HCD (opens in new tab)).
A size limit doesn't mean your layout fits. Setbacks, fire separation, stairs and access take space too.
Check coastal, fire, parking and older-building conditions early. Each can change what you build or what review you need.
Your mailing address doesn't tell you which rules apply. Your parcel does, identified by its Assessor's Parcel Number, or APN, the County's ID number for that piece of land.
Use the City's zoning portal, ZAPP (opens in new tab):


Layers to note: Coastal Overlay Zone, Beach Impact Area, transit priority area and fire hazard classification. Step 4 explains each. A blank field isn't proof of no restriction, and a survey might be needed, so be sure to go through each step carefully as you get educated on how to prepare your project.
Not in the City of San Diego? Use the County's ADU resources (opens in new tab) or the other city's planning department. Our guide to check whether your property can support an ADU explains the general method.
This is the record you'll hand to a designer or the City. Copy the table or download the printable version (opens in new tab); no email address required.
Label each finding Confirmed, Needs confirmation or Problem to look into. The labels describe findings, not approval.
San Diego allows four kinds of ADU:
a small house in the yard
an addition
existing space, like a garage
up to 500 square feet inside the home
| ADU | JADU | |
|---|---|---|
| Kitchen | Full kitchen | Kitchen or efficiency kitchen |
| Bathroom | Its own | Can share the main home's |
| Entrance | Its own | Its own outside entrance |
| Owner occupancy | Not required | Generally required if it shares a bathroom |
Scroll sideways if needed to see every column.
Under Government Code §66333 (opens in new tab), a JADU with its own bathroom doesn't require the owner to live on site. One that shares a bathroom generally does, with exceptions for government agencies, land trusts and qualifying housing organizations. Get the City's Junior Unit Agreement, DS-202A (opens in new tab), before you commit to a rental plan; the City's code and bulletin don't fully match it yet.
State law and City rules allow different combinations. Ask your designer which route each unit uses; don't add the totals together.
| What's on the lot | Combination to investigate | Key conditions |
|---|---|---|
| Single-family home, state route | One conversion ADU, one JADU and one detached ADU | The detached unit can be up to 800 sq ft of interior livable space, with 4-foot side and rear setbacks. |
| Single-family home, City route | One ADU in existing or planned space, one attached or detached ADU, and one JADU | Local size, placement and coastal rules apply. More units require the bonus program. |
| Existing multifamily building, state route | Conversions of non-livable space, plus detached ADUs | Conversions up to 25% of existing units; up to eight detached, but no more than existing units. |
| Planned multifamily building, state route | Up to two detached ADUs | State height limits and 4-foot side and rear setbacks. |
Scroll sideways if needed to see every column.
"Multifamily" means attached homes in one building, like a duplex. Several separate houses on one lot don't automatically count. See the HCD ADU handbook (opens in new tab), pages 16 to 18 and 31.
The City's ADU Home Density Bonus Program lets eligible lots add more ADUs in exchange for renting some at affordable rents for years.
These are the City's non-coastal rules, in SDMC §141.0302(d) (opens in new tab). Coastal lots differ; see Step 4.
Size. New attached or detached ADUs: generally 150 to 1,200 square feet of gross floor area. Qualifying conversions are exempt from that cap and can add up to 150 square feet for getting in and out. JADUs: up to 500 square feet, not counted toward FAR.
How area is measured. Gross floor area includes the walls; interior livable space, used by some state limits, doesn't. Keep both numbers on your drawings.
Height. City rules apply the zone's height limits and cap detached ADUs in single-dwelling-unit zones at two stories. State-protected detached units are generally limited to 16 feet, or 18 feet in qualifying cases. A second story also needs room for exterior stairs.
Setbacks. A setback is the minimum distance from a property line. Outside the Coastal Overlay Zone:
If City rules rule out your design, look at the state route, which can exempt units from local front setbacks, FAR and other standards. The state has challenged parts of the City's ordinance (opens in new tab), so if a rule limits you, ask the City in writing which applies.
Fire separation. This comes from the building code, not zoning. For a typical non-sprinklered home under CRC Table R302.1(1) (opens in new tab), walls less than 5 feet from the line need a one-hour fire rating. No windows or doors are allowed within 3 feet, and from 3 to 5 feet, openings are limited to 25% of the wall.

| Space on the lot | What controls it | Who checks it |
|---|---|---|
| ADU footprint | Size limits and how area is measured | Designer and plan review |
| Zoning setback | Base zone, City ADU rules or the state route | Planning and zoning review |
| Fire-separation band | Building code limits on walls and openings | Building plan review |
| Exterior stairs | Zone setbacks and building code | Designer and plan review |
| Path from the street | Access, utility routes and, for bonus projects, evacuation access | Designer and Fire-Rescue |
Scroll sideways if needed to see every column.
Your ZAPP lookup shows which of these apply.
In the Coastal Overlay Zone, you may need a Coastal Development Permit, even to convert a garage. Note whether your lot is in the appealable area, where decisions can go to the California Coastal Commission.
Coastal rules also lag. Per the City's adoption register (opens in new tab), Housing Action Package 2.0 reached the coast March 11, 2026, but the 2025 and 2026 ADU amendments still await coastal certification, so don't assume the newer bonus caps apply there.
Next step: ask ADUs, Planning and Zoning which permit process and rules version governs your project.
The City's fire map, effective August 30, 2025, raises some State Moderate or High areas to Very High, so use the City map. Expect review of wildfire-resistant construction and defensible space.
Next step: save your result from the City fire map (opens in new tab) and ask Fire-Rescue about materials, brush management and access before choosing a location.
Most standard ADUs don't need parking. The main exception is a Beach Impact Area lot outside a transit priority area, which may need one space unless the ADU is 500 square feet or less. Replacing parking lost in a garage conversion is a separate question, and bonus units outside a transit priority area have their own rule. If a conversion leaves your curb cut out of compliance, the City can require you to close it.
Next step: measure and photograph your driveway, then ask Right-of-Way Permits what the conversion triggers.
Work on a parcel with any structure 45 years or older, including a garage, can trigger historical screening. Interior-only work is exempt, and age alone doesn't make a building historic. See the City's review of buildings over 45 years old (opens in new tab).
Next step: bring building records, exterior photos and your scope to a Historical Resources appointment.
Ask early about electrical capacity (SDG&E (opens in new tab)), the sewer tie-in and water service (IB166 (opens in new tab)). Qualifying conversions generally don't need new connections. A title review finds easements; slopes may need survey and soils work.
Next step: ask for a utility determination for your project rather than assuming shared or separate meters.
For what these conditions mean for your budget, see ADU costs in San Diego.
| Original proposal (2021 public pilot) | Finding | Supporting evidence | Resulting design or scope decision | Remaining uncertainty |
|---|---|---|---|---|
| A studio ADU at a San Diego Housing Commission property | Site slopes required changes after construction began | SDHC pilot report, page 23 (opens in new tab) | Drawings were revised and resubmitted to the City | The report doesn't isolate the exact redesign or delay |
Scroll sideways if needed to see every column.
Every ADU and JADU needs a building permit. A typical sequence:
such as coastal, historical and right-of-way.
site and floor plans, elevations, structural documents, energy calculations and forms.
through the City's Development Services Application Portal, choosing Building Construction. Follow IB400's instructions (opens in new tab).
on completeness and plan review.
such as fees and required agreements.
before anyone moves in.
Under Government Code §66317 (opens in new tab), the City generally has 15 business days to say whether your application is complete and 60 days to approve or deny a complete one. These are review deadlines, not construction timelines.
Fees. For what to budget for permit, school and utility fees, see permits and local fees in our San Diego ADU cost guide.
The City's ADU resources (opens in new tab) point to preapproved plans from the County, Chula Vista and Encinitas. Ask about licensing and current-code compatibility. City master plans can expire when a new building code takes effect (IB114A (opens in new tab)), and every plan still needs a site plan and review.
DSD appointments (opens in new tab) can be a helpful resource. Book an appointment for help explaining the process.
| Unresolved question | Exact route | Bring and ask | Expected result |
|---|---|---|---|
| Which rules apply to my ADU? | ADUs, Planning and Zoning | APN, ZAPP findings and your idea. Ask which provisions apply. | Orientation and the right review route |
| Do I need historical review? | Historical Resources | Building ages, photos and changes. Ask what's needed. | Required records and route |
| Does my driveway have to change? | Right-of-Way Permits | Site sketch and driveway measurements. Ask what work is triggered. | Procedure and scope |
| I need a written answer about this layout. | Preliminary Review, IB513 (opens in new tab) | Drawings and focused code questions | Written responses |
| What does a plan-check comment mean? | Your assigned reviewer | Project number, the comment and your proposed fix | What resolves it |
Scroll sideways if needed to see every column.
A script to adapt: "I'm considering a [project type] at APN [number]. ZAPP shows [condition], but I need to know [issue]. What should I bring?"
Preliminary Review costs $1,588.73 for one discipline or $12,983.99 for several (checked October 7, 2026), so save it for a question you can't resolve another way.
Often, yes. Check whether the conversion qualifies, the garage's permit history, historical screening if it's 45 years or older and, near the coast, parking.
Possibly. Check the height limit that applies, the side and rear setbacks and where stairs would go, all together.
Not for a standard ADU. A JADU that shares the main home's bathroom generally requires it; one with its own bathroom doesn't.
No. A preapproved plan covers the building design. Your site and application still need review.
There's no single number. Ask for an estimate that separates permit, impact, school and utility charges, starting with the City's fee schedule, IB501 (opens in new tab). Our guide to ADU costs in San Diego covers the full budget.
Wonderly helps homeowners plan ADUs with trusted local builders; this guide draws on real projects, official sources, and expert review.
Every cost, rule, and timeline links to its source, whether official city code, published pricing, or real builder proposals. Every page explains how we calculate every estimate and range.
A named ADU builder, architect, or expert reviews each guide. We show their credentials, the date reviewed, and what still needs local verification.
Our ADU planner uses this same data and method to turn your exact address and personalized goals into options, costs, and local rules for your specific property.
local guidance and plans.
your parcel's zoning and mapped conditions.
state-law routes and protections.
choose the service that fits your question.
the route for unincorporated property.